TensionCam strengthens partnership with Rabbalshede Kraft AB

Exciting news – we are expanding our collaboration and partnership with the Swedish wind park operator Rabbalshede Kraft!

And as a result, we are happy to announce that Rabbalshede has decided to extend their earlier order. TensionCam will now go from working with just one wind turbine, to cover the nuts and blade bolt needs of all wind turbines in one of Rabbalshede‘s wind parks. This equals almost 1 200 pieces of TensionCam M36 nuts and blade bolts, which will be delivered and installed in the summer of 2025.

Upgrading for extended life and sustainability

Our TensionCam nuts and bolts will replace the current nuts and bolts connecting the blades to the tower of 17 years old wind turbines. As a result of this, Rabbalshede will be able to measure the clamp load at both installation and during the continued service life of the wind turbines. Thanks to the improved clamp load control, Rabbalshede can enhance the opportunities for extended life certification of the wind turbines.

The extended order indicates the confidence and potential that both we and Rabbalshede see in our collaboration and the TensionCam concept,” says Jonas Nilsagård, CEO of TensionCam.

Marie Magnusson, COO at Rabbalshede adds: ”Our partnership with TensionCam is really exciting. In addition to securing Life Extension certification, we are also enhancing various sustainability dimensions by installing the TensionCam nuts”.

For more information, please contact:

Jonas Nilsagård, CEO
+46 734 29 81 55
e-mail: jonas.nilsagard@tensioncam.com